The University of British Columbia
UBC - A Place of Mind
The University of British Columbia
Library
Library Home / About Us / 2025 / April / 15 / Irving K. Barber Learning Centre undergoing building maintenance from April 28 to May 16

About Us

News Contacts

Amelia Nezil
Director, Communications & Marketing
UBC Library
Tel: 604 822 5142
amelia.nezil(at)ubc.ca

Irving K. Barber Learning Centre undergoing building maintenance from April 28 to May 16

By Anna Moorhouse on April 15, 2025

Building exterior of the Irving K. Barber Learning Centre (IKBLC) at the UBC Vancouver campus

The Irving K. Barber Learning Centre (IKBLC) will be undergoing scheduled maintenance work above the entrance to the Chung | Lind Gallery from Monday, April 28 to Friday, May 17, 2025. During this time, visitors can expect elevated noise levels from 7:00 a.m. to 6:00 p.m. on Monday through Friday.

The Chung | Lind Gallery will be closed during this time, and is expected to reopen on May 20, 2025.

Posted in Carousel, General | Tagged with closures, construction, IKBLC

  • Previous
  • Next
,


Back to top
The University of British Columbia
  • Emergency Procedures |
  • Terms of Use |
  • Copyright |
  • Accessibility
OSZAR »